Key Data
Completion
2000
Location
Øresund Channel, between Sweden and Denmark
Length
16.4km
Estimated investment
DKK12 billion
Construction and project management
Øresundskonsortiet
Øresund bridge and other works
Sundlink Contractors, Skanska AB, Højgaard & Schultz, Monberg & Thorsen, Hochtief AG
Øresund tunnel
NCC AB, Dumez-GTM SA, John Laing Ltd, E. Pihl & Søn, Boskalis Westminster

In 1991, the Danish and Swedish governments signed an agreement to establish a fixed link across the Øresund. The agreement was ratified by the two countries' parliaments in August of the same year. Øresundskonsortiet, a joint venture between A/S Øresund and Svensk-Danska Broförbindelsen SVEDAB AB, constructed the permanent link between Sweden and Denmark. The project cost more than DKK12 billion and comprises a 16.4km (10-mile) link between Copenhagen and Malmö consisting of a tunnel, a bridge and an artificial island.

In May 2003 the Øresund Bridge won the IABSE Outstanding Structure Award. The judges commended the project for its innovative planning, design and construction management as well as its compliance with the time schedule, budget and tough environmental requirements.

Article Continues


ØRESUND LINK BRIDGE APPROVAL

Through the agreement, the two governments each hold a 50% stake in Øresundskonsortiet. The project was officially started when The Danish Ministry of Transport approved the general design, alignment and environmental conditions for the Øresund Link on Danish territory. Once completed in March 2000, the bridge was handed over to the client Øresundsbro Konsortiet by the contractor Sundlink. In April, the tunnel and the artificial island Peberholm were handed over to the client Øresundsbro Konsortiet by the contractors ØTC and ÖMJV. The Øresund Bridge was inaugurated in July 2000.

PROJECT TIMESCALE

The project originally began in March 1991 when the Danish and Swedish governments signed the agreement. In January 1992, Øresundskonsortiet was formed through a partnership agreement. In September 1993 the first turf was cut, and in June 1994, the Swedish government approved the construction of the link on Swedish territory. From July to November 1995, Øresundskonsortiet signed contracts with all the necessary companies for the construction. By March 1999, the first vehicle was driven through the tunnel, and by December, the first rail track between Malmö and Copenhagen was completed.

The whole project consisted of the construction of a bridge, a tunnel and an artificial island between the two countries that stretched 16.4km. The tunnel construction contract had a value of DKK3.98 billion. The contract for the artificial island had a value of DKK1.4 billion and the contract for the construction of the high bridge and the two, two-level approach bridges with the motorway on the upper level and the railway on the lower level had a value of DKK6.3 billion.

ØRESUND BRIDGE

The Øresund Bridge is composed of a high bridge and two approach bridges. The high bridge has the longest cable-stayed main span in the world for both road and rail traffic.

The bridge two-level superstructure is fabricated from steel and concrete. The steel girder supports the upper deck, which accommodates the motorway, and the lower deck where the railway is located. The tracks are placed in a concrete trough along the approach bridges, which changes to a steel deck on the high bridge.

ØRESUND TUNNEL

The western part of the Øresund Link is a 4km-long tunnel between the artificial island of Peberholm and the artificial peninsula at Kastrup. The tunnel is the longest immersed tube tunnel for both road and rail traffic in the world. It consists of 20 tunnel elements.

ARTIFICIAL ISLAND (PEBERHOLM) AND PENINSULA

The artificial island of Peberholm was built in order to transfer the traffic from the immersed tunnel up onto the approach bridge. Peberholm is approx. 4km long and mainly made up of dredged material from the Øresund seabed. A total of 1.6 million m³ of stone and 7.5 million m³ of sand and dredged material were required for its completion.

The artificial peninsula at Kastrup, which accommodates the portal of the Øresund tunnel, was constructed by Øresund Marine Joint Venture (ØMJV). It covers 0.9km² and is made up of dredged material from the Øresund seabed.

LEAD CONTRACTORS

Øresundskonsortiet signed a contract with Øresund Tunnel Contractors for the construction of the immersed tunnel with two lanes in each direction, a double-track railway and a service tunnel. The tunnel contractors were a consortium consisting of NCC AB (SE), Dumez-GTM SA (F), John Laing Ltd (UK), E. Pihl & Søn (DK), and Boskalis Westminster (NL).

A contract was also made for the dredging and construction of the artificial island with Öresund Marine Joint Venture, consisting of Per Aarsleff A/S (DK), Ballast Nedam Dredging b.v. (NL) and Great Lakes Dredge & Dock Co (USA).

Øresundskonsortiet also signed a contract with Sundlink Contractors, Skanska AB (SE), Højgaard & Schultz (DK), Monberg & Thorsen (DK), Hochtief AG (Germany), for the high bridge and the two, two-level approach bridges with the motorway on the upper level and the railway on the lower level.

A view of the Oresund bridge.

Expand Image Expand Image
The Øresund Bridge permanent fixed link runs from Copenhagen in Denmark to Malmö in Sweden.

An aerial view of the artificial island close to completion

Expand Image Expand Image
The artificial island of Peberholm was built in order to transfer the traffic from the immersed tunnel up onto the approach bridge.

The High bridge with the islands Saltholm and Peberholm in the background

Expand Image Expand Image
The high bridge has the longest cable-stayed main span in the world for both road and rail traffic.

Pylon construction

Expand Image Expand Image
The first pylon leg reached its full height on 18 January 1999.

Aerial view of the Continental Line at Lockarp south of Malmo

Expand Image Expand Image
The Øresund Line connects to the Continental Line at Lockarp, south of Malmö.

The pontoon crane Svanen places the last bridge section on August 14 1999

Expand Image Expand Image
The pontoon crane Svanen places the last bridge section on 14 August 1999.

The Toll Station has 11 lanes in each direction October 1999.

Expand Image Expand Image
The toll station, situated at the Swedish side of the link, has eleven lanes in each direction, nine of which are equipped with card automats and/or manned by service personnel.



Post to:
Delicious  
Digg  
reddit  
Facebook  
StumbleUpon  


Home
New On This Site
Products & Services
Company A-Z
Industry Projects
Features
White Papers
Jobs & Careers
Industry News
Events & Exhibitions
Newsletter Archive
Newsletter Sign-Up
Advertise With Us
About Us
Client Area


RSS What is RSS
The website for the road traffic industry